Low Cement Top System

OPERATION

The Lee Energy Systems’ PPT Gator Perforator allows operators to perforate multiple zones and see individual zonal injection rates on one trip. The system can be run on jointed pipe or coiled tubing.

• Run in hole to desired depth straddling the packers over the intended stim zone.
• Circulate through the VCV at specified rate.
• Activate Packers by flowing at specified rate to close VCV & within the rate window for zonal stimulation.
• To deactivate packers, simply kick out the pumps. The packers will retract to their original position.
• Allow time for annular equalization and pull to the next stage.
• Repeat Activation, Stimulation, and Deactivation sequence for all intended zones.
• When stages are complete, pull out of hole.

A green tube with blue and white lines on it.

to unload internal pressure and allow the annulus and tubing to equalize for retraction of the Gator.

Hydro-Mechanical Perforator

Tension or Rotaionally set

PDF REQUEST FORM

JOB REQUEST FORM

Please provide your details below and we will contact you within 72 hours

Contact Information
Well Information
Job Type
A logo of lee energy systems