Login

Lost your password?
Don't have an account? Sign Up

Annular Communication & Cementing System

to unload internal pressure and allow the annulus and tubing to equalize for retraction of the Gator.

Hydro-Mechanical Perforator

Tension or Rotaionally set

OPERATION

A brief description of where this will be utilized

• Run in hole to desired depth straddling the packers over the intended stim zone.
• Circulate through the VCV at specified rate.
• Activate Packers by flowing at specified rate to close VCV & within the rate window for zonal stimulation.
• To deactivate packers, simply kick out the pumps. The packers will retract to their original position.
• Allow time for annular equalization and pull to the next stage.
• Repeat Activation, Stimulation, and Deactivation sequence for all intended zones.
• When stages are complete, pull out of hole.

JOB REQUEST FORM

Please provide your details below and we will contact you within 72 hours

Contact Information
Well Information
Job Type