A land well located in the Permian required an acid stimulation on a previously perforated 5 ½ inch cased well bore (17 ppf J55). 200 ft cluster sections were isolated between an upper and lower packer element with two packers ran top and top bottom. The nozzle configuration was set up to engage packer elements at 5 – bpm. Once this rate was achieved acid was diverted/placed with successful isolation into all 25 zones.